Home

  | 

Contact Us  | 

Sitemap

 
JK Technosoft
Flash-Banner
Vertical-spacer

Application Roll-out

Vertical-spacer

Applications Rollouts (Multi Site/Multi Country)

  • Roll out an existing application to multiple sites within a given geographical territory.
  • The existing process model will be adopted as it is. The same will be rolled out to the other sites
  • The scope of roll-out includes
    • Prepare the scope of the Roll-out
    • Prepare Roll-out kit
    • Train the team
    • Prepare the logistics for Roll-Out
    • Central support for co-ordination and monitoring
    • Carry out the Roll-out
    • Conduct post Roll-out Audit