Application Roll-out
Applications Rollouts (Multi Site/Multi Country)
- Roll out an existing application to multiple sites within a given geographical territory.
- The existing process model will be adopted as it is. The same will be rolled out to the other sites
- The scope of roll-out includes
- Prepare the scope of the Roll-out
- Prepare Roll-out kit
- Train the team
- Prepare the logistics for Roll-Out
- Central support for co-ordination and monitoring
- Carry out the Roll-out
- Conduct post Roll-out Audit